
Description
Class A Distribution Center Spacing 50 x 40 column spacingClear Height 26 Lighting LED throughoutDock Doors 9 Construction Concrete tilt-wallDrive-in Doors 3 Availability Available 9/1/2023Sprinklers ESFR sprinklered Asking Rate $14.50Configuration Rear loading site OPEx $3.40
-
0BEDS
-
22.48ACRES
-
0BATHS
-
01/2 BATHS
School Ratings & Info
Description
Class A Distribution Center Spacing 50 x 40 column spacingClear Height 26 Lighting LED throughoutDock Doors 9 Construction Concrete tilt-wallDrive-in Doors 3 Availability Available 9/1/2023Sprinklers ESFR sprinklered Asking Rate $14.50Configuration Rear loading site OPEx $3.40

IDX information is provided exclusively for consumers' personal, non-commercial use and it may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. This information is not verified for authenticity or accuracy and is not guaranteed. Data last updated 2023-06-01T12:18:49.343.